Email
 
PWD
 
Remember
_73_2

Self-contained, fully portable compact data center featuring extreme server and storage density with highly efficient cooling and easy serviceability.
 
Based on MES innovative modular data center design - this newest generation of the Data Center in a Box features nearly 70% greater density levels, a broader choice of container sizes and configurability of branded servers and storage from Sun, Intel, HP/Compaq, IBM, EMC, as well as more rapid production times.

Designed to augment or replace traditional brick-and-mortar data centers of any size, SCTX Cube features compute density levels of 7 times of classic data center in a 40 foot container.  
 
Key Features:

  • Sophisticated rack-cooling technology enables up to 70% reduction in cooling costs vs traditional data center
  • Easy serviceability central aisle for ample room to access systems
  • Leverages DC Power and UPS technology for maximum power efficiency
  • Can easily deployed for immediate functionality
  • Secure, weather tight ISO shipping container for easiest portability (air, land, water)
  • Totally mobile container for easy location near inexpensive land and power options 

MES mobile data center solutions are specialy built for extreem wheather conditions and Midlde Eastern standards, with;

  • Robust
  • Earthquake proof
  • Bulletproof
  • Open to customization features
  • DCs, DRCs and Telecom applications

Well suited for a broad range of deployment scenarios - from military applications to disaster recovery scenarios to temporary Data Center Shelters – SCTX Cube provides tremendous flexibility for expansion to areas in which traditional data center facilities are unavailable, cost prohibitive or cannot otherwise capitalize on alternative energy sources in remote locations. The ability to deploy SCTX Cube rapidly and in any location helps enable business continuity, allowing for easy hardware migration and an expedited disaster recovery processes. Already in production, a fully populated SCTX Cube can be designed, built and delivered in a matter of weeks.

Layout Element
Tags: MES
Copyright © 2009