Once your new data center has been built, you want to ensure that it has been built according to the applicable standards and international best practices. It is a known fact that some contractors ‘cut corners’.
|
Elite 3rd party, vendor independent data center testing & commission units that mobilize and camp on data center site, running rigorous test scripts, using sophisticated equipment and tools, that test and commission every component of the data center with absolute know-how of exact approach to commission a site fault-tolerant, fail-safe and reliable for live operation
|
With power and energy costs rising, and IT equipment stressing the power and cooling infrastructure, some identifies an economic and operational crisis looming. CIO’s today are being challenged to reorganize their data centre strategies, adding power and energy efficiency to a list of critical operating parameters that already includes, reliability, serviceability and performance. A green data center initiative can help a company regain power and cooling capacity, recapture resiliency and help meet business needs, while at the same time dramatically reducing energy costs and the total cost of ownership.
|
MES is specialized in designing and engineering classic data centers, web application hosting facilities, network operations centers, telecommunication centers and other mission critical facilities with high-availability requirements.
|
Self-contained, fully portable compact data center featuring extreme server and storage density with highly efficient cooling and easy serviceability.
|
The Outdoor-data center is specifically developed for mobile or temporary utilisation of IT systems considering physical IT security aspects.It is the energy-efficient and quickly available solution for the accommodation of IT systems, ready for use, in a very short time anywhere.
|
In today's technology-driven economy, managers of electronic assets, from data centers to production systems to generators are focused on elimination of downtime. For many industries, the "no downtime" operating parameter is not just an objective; it's a matter of life or death.
|
Physical security is the first ring in MES layered security approach. Without stringent physical security measures, additional network and data security is marginal at best. That’s why MES has designed data centers to be as secure as possible against unauthorized access, theft, fire and other physical threats. MES monitors the physical security of data center 24/7 via biometric technologies, CCTV and physical alarm systems.
|
The Network Operations Center (NOC) is the command and control center and the core of data center facilities. MES provides total NOC architecture and setup including space design, console fixtures, and audio visual systems, network and support infrastructure, monitoring and managed services, as well as installation, documentation, and training.
|
MES disaster recovery plan is the part of an overall contingency plan that contains a process enabling an enterprise to restore any loss of data in the event of fire, vandalism, natural disaster, or system failure. MES is prepared to provide adequate computational, data storage, and data communications services and facilities at an off-site disaster recovery resource for critical applications.
|
MES’s Network and Security Design Services for data centers are part of design phase of MES lifecycle services approach. The MES securitydesign methodology considers all aspects of network security and its integration with network infrastructure. Using as in-depth, architectural approach based on industry standards, MES helps develop a multilayer defense against directed attacks from hackers or discriminate attacks from viruses and worms.
|
SCHÄFER IT Rack solutions are as different as your needs and requirements! Two systems with a different focus in terms of security, internal design and air-conditioning, together provide the basis for a series of racks that, with the available equipment,meet your demands exactly.
|